STONE PITCHING ON NJAKA ROAD FY26/27(ON-GOING)

Stone pitching works on Njaka Road are an important road maintenance and improvement activity aimed at controlling soil erosion, improving drainage, and protecting the road infrastructure from damage caused by running water, especially during rainy seasons. The implementation of these works is intended to improve road durability, enhance accessibility, and ensure the safe movement of pedestrians, motorists, and other road users.
Implementation of Stone Pitching Works
Stone pitching involves placing and arranging stones along vulnerable road sections, drainage channels, slopes, and embankments to prevent soil from being washed away by rainwater. On Njaka Road, these works help stabilize the road edges and protect areas that are susceptible to erosion due to water runoff.
The activity involves site preparation, excavation where necessary, proper arrangement of stones, and securing them to provide a strong and durable surface. Proper drainage channels should also be maintained to direct rainwater away from the road and prevent damage to the stone-pitched sections. Where required, technical supervision is necessary to ensure that the works comply with the approved engineering standards and specifications.
Importance of the Works
The stone pitching works on Njaka Road are expected to reduce soil erosion, prevent the formation of gullies, and minimize damage to the road infrastructure. They also help improve drainage, reduce road maintenance costs, and extend the lifespan of the road. Furthermore, improved road conditions support the transportation of people and goods, facilitate access to homes and businesses, and contribute to local economic development.
Pictorial
